Gujarat's Bulk Drug Park at Jambusar, Bharuch Opens for Industrial Plot Allotment
OFFICIAL UPDATE: Industrial Plot Allotment Window
Applications Open From: 26th October 2026
Target Industries: Manufacturers of Bulk Drugs, Active Pharmaceutical Ingredients (APIs), Drug Intermediates, and Key Starting Materials (KSMs)
Location: Jambusar, Bharuch District, Gujarat (Spread across 2,015 Acres)
Official Application Portal:GIDC e-Governance Portal
Given the strategic national priority of this central government-backed park, demand is extremely high. Ensure your DPR, financial documentation, and utility projections are fully prepared.

In a monumental move to solidify India's journey toward Aatmanirbhar Bharat (Self-Reliance) in the pharmaceutical sector, the Industries and Mines Department, Government of Gujarat and the Gujarat Industrial Development Corporation (GIDC) have announced the official opening of industrial plot allotments for Gujarat's Bulk Drug Park at Jambusar, Bharuch.
Spanning an immense 2,015 acres (approx. 815 hectares), the Jambusar Bulk Drug Park is one of only three national mega parks selected and supported by the Government of India under the flagship "Scheme for Promotion of Bulk Drug Parks" (Department of Pharmaceuticals, Ministry of Chemicals & Fertilizers). With dedicated common infrastructure facilities engineered specifically for chemical synthesis, API extraction, and high-load compliance, this estate offers manufacturers a decisive competitive edge.
About Gujarat's Bulk Drug Park at Jambusar
India's pharmaceutical sector is globally renowned as the "Pharmacy of the World," yet the country has historically remained dependent on imports for critical Active Pharmaceutical Ingredients (APIs) and Key Starting Materials (KSMs). The Jambusar Bulk Drug Park was conceptualized to eliminate this vulnerability by drastically lowering manufacturing costs through shared, high-efficiency utilities.
GIDC serves as the State Implementing Agency (SIA). Located in the industrial heartland of Bharuch district—which already anchors the Dahej PCPIR, Saykha Chemical Park, and Ankleshwar chemical clusters—Jambusar brings together existing supply chains, abundant skilled workforce, and deep chemical engineering expertise.
Master Plan & Land Allocation
The master plan for the Jambusar Bulk Drug Park has been developed in line with international environmental and industrial town-planning benchmarks. Over 61% of the estate is earmarked purely for manufacturing plots, supported by robust buffers, eco-green belts, and world-class utility complexes.

Below is the detailed land use zoning breakdown as per the official GIDC master plan:
| Zoning Component | Allocated Area (Hectares) | Strategic Purpose |
|---|---|---|
| Industrial Plot Area | 499.8 ha | Core manufacturing units for Bulk Drugs, APIs, KSMs & Intermediates |
| Area under CRZ | 58.1 ha | Coastal Regulation Zone environmental compliance boundary |
| Road Network Area | 57.7 ha | Heavy-load 4-lane & 6-lane internal spine logistics roads |
| CETP Complex | 41.8 ha | Mega Common Effluent Treatment Plant with ZLD capabilities |
| Central Rainwater Nala | 30.9 ha | Engineered stormwater drainage and flood prevention network |
| Warehouse Zone | 27.8 ha | Cold storage, hazardous solvent storage, and API logistics |
| Green Belt Area | 22.6 ha | Perimeter vegetative buffer mitigating airborne emissions |
| Commercial Area | 16.9 ha | Banking, freight offices, trade centers, and administrative cells |
| TSDF Complex | 15.1 ha | Treatment, Storage & Disposal Facility for hazardous solid waste |
| Housing & Residential Area | 13.6 ha | Staff quarters, engineer dormitories, and executive amenities |
| Utility Area | 13.6 ha | Power substations, water pumping stations, and gas networks |
| Parking Area | 13.4 ha | Dedicated heavy commercial vehicle (HCV) and tanker parking |
| Village Buffer & Common Green | 2.6 ha | Ecological buffer safeguarding adjoining rural settlements |
| Common Facility Center (CFC) | 1.5 ha | Analytical testing labs, QA/QC, pilot plants, regulatory offices |
Specialized Common Infrastructure Facilities (CIF) Built Around Pharma
In a typical chemical or pharmaceutical setup, individual manufacturers spend 30% to 40% of their total capital expenditure (CAPEX) on captive pollution control, steam generation, and solvent recovery. At Jambusar Bulk Drug Park, GIDC has pre-built these mission-critical utilities as Common Infrastructure Facilities (CIF):
- Common Effluent Treatment Plant (CETP - 41.8 ha): High-capacity, multi-stage treatment equipped with primary, biological, tertiary, and Zero Liquid Discharge (ZLD) systems to handle complex pharma effluents.
- Marine Deep Sea Discharge Pipeline (11 km): Engineered 11 km offshore marine disposal pipeline with deep-sea diffusers, compliant with strict Central Pollution Control Board (CPCB) and Gujarat Pollution Control Board (GPCB) dilution norms.
- TSDF Hazardous Waste Facility (15.1 ha): On-site Treatment, Storage & Disposal Facility for safe incineration and secured landfilling of solid chemical residues.
- Centralized Steam Supply: High-pressure steam piped directly to unit boundaries, eliminating the need for individual boilers, coal/gas permits, and boiler operator overheads.
- Common Solvent Recovery System (SRS): High-efficiency distillation columns and storage yards to recover expensive solvents, slashing OPEX by up to 25%.
- Guaranteed Process Water Supply: Dedicated industrial water pipeline infrastructure connected to the Narmada canal network, ensuring uninterrupted raw process water.
- Uninterrupted Industrial Power: Dedicated dual-circuit high-tension power grid with substation backups to safeguard continuous chemical reactions and fermentation batches.
- Dedicated Warehousing & Logistics Hub (27.8 ha): Specialized storage facilities for raw chemical precursors, temperature-controlled drug storage, and containerized handling.
- Common Facility Center (CFC - 1.5 ha): NABL-accredited analytical testing laboratories (HPLC, GC-MS, NMR), pilot validation suites, and environmental compliance support.
Strategic Location & Multi-Modal Connectivity
Situated in Jambusar Taluka of Bharuch district, the park offers unmatched multi-modal connectivity to ports, airports, rail freight corridors, and major domestic chemical consumption centers.

Key connectivity points include:
- Nearest Port: Dahej Commercial Port (65 km) & Hazira Port, offering rapid maritime access for importing chemical intermediates and exporting finished APIs worldwide.
- Nearest Railway Junction: Bharuch Railway Station (48 km) on the main Mumbai-Delhi rail trunk line.
- Nearest Airport: Vadodara Airport (65 km) for domestic business travel, and Ahmedabad International Airport (170 km) for global air freight.
- Highway Grid: National Highway NH-228 (24 km) and rapid access to NH-48 (Golden Quadrilateral).
- Dedicated Freight Corridor (DFC): Seamless link to the Western Dedicated Freight Corridor for rapid transit between Gujarat ports and Northern India's pharma consumption belt.
- PCPIR Chemical Synergy: Just 25 km from the Gujarat PCPIR (Petroleum, Chemicals and Petrochemicals Investment Region), ensuring immediate availability of basic raw materials like benzene, toluene, chlorine, and ethylene oxide.
- Deep Sea Marine Discharge: Just 11 km to marine disposal point in the Gulf of Khambhat.
Gujarat: The Global Leader in Pharmaceutical Manufacturing
Setting up in Gujarat gives pharma entrepreneurs an insurmountable ecosystem advantage. The state is India's leading producer, exporter, and innovator of pharmaceutical formulations and bulk drugs.

According to official data from the Food and Drugs Control Administration (FDCA) Gujarat:
- Landmark Production Share: Although Gujarat occupies only 6% of India's landmass, it produces 1/3rd (33%) of all pharmaceutical products in India.
- Export Leadership: Accounts for 28% of India's total pharmaceutical exports to regulated markets like the US, EU, and Japan.
- Contract Research (CRAMS): Over 40% of India's Contract Research and Manufacturing Services (CRAMS) are based in Gujarat.
- Global Regulatory Compliance: Home to 4,776 licensed manufacturers, including 700 WHO-GMP compliant facilities and 130+ US FDA approved manufacturing plants (the highest concentration in any Indian state).
- Global Scale: Gujarat is the largest manufacturer of contraceptive pills in the entire world.
Eligibility Criteria & Permitted Industries
Because Jambusar Bulk Drug Park has been developed under a specific central scheme with dedicated environmental clearances, the land allotment is restricted strictly to relevant sectors:
- Active Pharmaceutical Ingredients (APIs): Antibiotics, antidiabetics, cardiovascular drugs, oncology APIs, analgesics, and vitamins.
- Key Starting Materials (KSMs): Core chemical building blocks specifically used as precursors for API synthesis.
- Drug Intermediates (DIs): Advanced intermediates undergoing chemical transformation into APIs.
- Fermentation & Biotechnology Based APIs: Microbial and enzyme-assisted bulk drug manufacturing.
- Excipients & Pharmaceutical Specialty Chemicals: Supporting pharma formulations subject to GIDC approval.
Note: General chemical manufacturing, dyes/pigments, plastics, and non-pharma engineering units are not eligible for allotment within this park.
The GIDC Online Allotment Process & Evaluation
Allotment for plots in the Jambusar Bulk Drug Park will be executed entirely through the GIDC e-Governance Portal (egov.gidcgujarat.org).
The selection process follows a rigorous scrutiny and scoring framework:
- Online Registration & Application Form Submission: Selecting the Jambusar Bulk Drug Park estate, choosing target plot dimensions, and filling out activity profiles.
- Detailed Project Report (DPR) Submission: Uploading comprehensive technical, financial, and environmental blueprints.
- Utility Demand Projections: Documenting estimated process water consumption, daily steam requirement (TPH), electrical load (kVA/MVA), and effluent load (COD/BOD).
- Screening by GIDC Allotment Committee: Evaluating the applicant's technical capability, financial net worth, employment generation, and project viability.
- Allotment Committee Interview: Personal presentation before the GIDC Scrutiny Committee to justify land requirements and timeline to commercial production.
- Issuance of Offer-cum-Allotment Letter: Payment of required earnest money deposit (EMD), down payment, and execution of the 99-year lease agreement.
Mandatory Documents & DPR Checklist
To avoid disqualification or technical queries from the GIDC scrutiny cell, applicants must ensure the following documentation is prepared with absolute precision:
- Bankable Detailed Project Report (DPR): Outlining manufacturing processes, plant layout, machinery list with quotations, chemical mass balance, and solvent flowcharts.
- Chartered Accountant Certified Net Worth Certificate: Verifying applicant's financial capability to execute the proposed capital investment.
- 3-Year Audited Financial Statements & ITR: Balance sheets, profit and loss statements, and tax audit reports of the promoter entity or directors.
- CMA Data & Means of Finance: Detailed cost of project, promoter contribution, debt-equity ratio, and bank sanction letters (or in-principle financing approvals).
- Effluent & Hazardous Waste Management Plan: Quantitative discharge estimates mapped against the park's CETP, TSDF, and marine pipeline inlet parameters.
- Corporate KYC & Constitutional Documents: PAN, GSTIN, Udyam Registration, Certificate of Incorporation, MOA & AOA (for Companies) or Partnership Deed & Form C (for LLPs/Firms).
Why Choose V & V Associates for Your GIDC Allotment
Securing an industrial plot in a flagship national park like Jambusar is highly competitive. With hundreds of pharmaceutical corporations, MSMEs, and PLI beneficiaries vying for prime locations, an incomplete or weak application will lead to rejection.
At V & V Associates, our team of seasoned Chartered Accountants, industrial financial analysts, and GIDC advisory professionals bring proven expertise:
- 1,215+ Successful GIDC Applications: Extensive track record across GIDC estates throughout Gujarat (including Dahej, Saykha, Ankleshwar, Sanand, and Pipardi).
- Bankable DPR Preparation: Technical and financial DPRs crafted specifically to score maximum points under GIDC's allotment evaluation matrix.
- CA-Certified CMA Data & Net Worth Certifications: Precise capital structuring, CMA projections, and net worth documentation that clear screening seamlessly.
- Environmental & Utility Demand Mapping: Assistance in preparing accurate solvent, steam, effluent, and power projections to meet park entry criteria.
- End-to-End Liaison & Interview Support: Complete guidance throughout the online submission, scrutiny query resolutions, and allotment committee presentations.
Official GIDC Announcement Notice
Below is the official announcement circular issued by the Industries and Mines Department, Government of Gujarat and GIDC for the Jambusar Bulk Drug Park plot allotment opening on 26th October 2026:

